AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |
Back to Blog
Kick sinhala sub9/21/2023 ![]() Then WAIT a further 12 hours before attempting to kick-offĤ.3 IF the plug does not show signs of compressive strength Then DRESS OFF a further 20-30 ft comparing drillability with that of the original hole DRESS OFF 20 ft, and WEIGHT TEST the plug SET a 300 - 500 ft neat cement plug (Class G in the production hole section) at 17.0 ppg (batch mix the slurry if possible).ģ. The general procedure for setting sidetracking cement plugs is to:ġ. However, if only medium to hard formations exist at the required sidetrack depth, a high degree of patience is required.Ī controlled ROP should be maintained until confirmation of a successful kick-off is achieved. If possible, the kick-off location should be selected where a soft or soft to medium formation is present in order to increase the chances of obtaining a successful kick-off. The most effective BHA configuration to achieve a successful sidetrack kick off is a mudmotor with bent sub. ![]() This lateral force should be provided by the geometry of the BHA forcing the cut on the side of the hole. The main requirements in sidetracking a well is the development of a lateral force to allow the bit to cut on the side of the hole. Wells may require sidetracking in order to re-drill the well to a new target, sidetrack past a fish or sidetrack due to hole problems. ![]()
0 Comments
Read More
Leave a Reply. |